Home > Products > Complete Beneficiation Plant > Gravity Processing Plant > Cassiterite Ore Mining Processing Plant For Tin Extraction

Cassiterite Ore Mining Processing Plant For Tin Extraction

Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,FCA,CPT
Min. Order:
1
Transportation:
Ocean
Port:
Qingdao Port,Tianjin Port,Shanghai
Share:
  • Product Description
Overview
Product Attributes

Model No.300TPD

BrandMingyuan

CertificationOther

TypeGravity Separator

CustomizedCustomized

ColorMulti Color

Warranty1 Year

Energy SavingEnergy Saving

Material FeatureHeat Resistant

MaterialCarbon Steel

Weight>10T

Voltage380V

ConditionNew

Applicable MaterialChrome, Tin, Hematite, Placer Gold

Spiral Chute Model1200mm

Shaking Table Model6-S

Ball Mill Power245KW

Shaking Table Power1.1KW

Optional Capacity100, 300, 500TPD

Spiral Classifier1500x9000mm

Slurry Pump45KW

Capacity30 TPH

Ball Mill2400x4500

Supply Ability & Additional Information

PackagingContainer Loading

Productivity100-10000tpd

TransportationOcean

Place of OriginHenan, China

Supply Ability20 Sets per month

CertificateCE, ISO

HS Code8474100000

PortQingdao Port,Tianjin Port,Shanghai

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

Packaging & Delivery
Package Type:
Container Loading

Tin Processing Plant or Tin Mining Process, is a tin Beneficiation Plant that aiming to ungrading the tin content, and cassiterite ore is the main mineral for tin ore production, and the tin ore processing plant with gravity method has been thought as an effective and environmental protection solution, the generally tin ore processing flowchart consists of two units, first the tin ore needs to be crushing and ground to about 6 mesh, secondly to separate the impurities from the ore, to upgrade the tin content, and the main equipment list for tin processing plant are crusher, Ball Mill, Spiral Classifier, jig machine, shaking table, spiral chute, Mineral Thickener, Filter Press and Rotary Dryer, the mineral thickener is mainly used for water recycling and dehydration. Mingyuan can provide the complete tin ore mining process for different capacities, such as 15 t/h, 50 t/h, 50 t/h and so on. as the cassiterite is the main resource for tin production process, so the tin ore processing plant is mainly for the cassiterite processing plant.

Tin Processing Plant or Extraction Of Tin From Its Ore is a mineral processing process with gravity solution, as the gravity of the Tin is heavy than the other impurities, so it is an effective and environmental protection solution to concentrate the tin ore.the main process includes three units: crushing---grinding and classifying---coarse washing and fine washing, after the fine washing, we can recover the Tin concentrate, we can get the dry Tin concentrate once the wet concentrate goes through the filter press and rotary dryer.

Cassiterite Ore Mining Process

Process of the Extraction Of Tin From Its Ore /Tin Processing Plant

1: First the Tin ore needs to be crushed with primary crusher and secondary crusher to reduce the sizes suitable for the feeding size of the ball mill, the primary crusher is Jaw Crusher, and the seconary crusher Fine jaw crusher, after crushing and screening, the required sizes are conveyed to the hopper before the ball mill

2:  there is an electromagnetic feeder under the hopper which is used to feed the Tin ore to the ball mill for grinding, after discharging from the ball mill, the slurry flows to the spiral classifier for classifying purpose, the oversizes particles will returned to the ball mill for regrinding. 

3: the required sizes will be pumped to the spiral chute for coarse separation and to the shaking table for fine separation, we can get the Tin concentrate from the shaking tables.

4: finally the wet Tin concentrate goes to the filter press and the rotary dryer, the dry Tin power is produced.

cassiterite ore mining process

Primary crusher for Extraction Of Tin From Its Ore /Tin Processing Plant

model

opening(mm)

max feed

 size (mm)

discharge

range (mm)

Capacity

 (t/h)

speed

(r/min)

Power

 (kw)

weigh

(kg)

PE-150

150*250

125

15-45

1.7-5.6

285

5.5

1000

PE-200

200*300

180

20-50

3.5-13.5

285

11

1500

PE-250

250*400

210

20-60

5-22

300

15

2800

PE-400

400*600

340

40-80

18-60

275

30

7000

PE-500

500*750

425

50-100

43-102

275

55

13500

PE-600

600*900

500

65-180

51-145

250

75

19200

PE-750

750*1060

630

80-180

122-223

250

110

29000

PE-900

900*1200

780

95-180

285-430

200

132

45000

PE-1000

1000*1200

850

195-280

320-470

200

132

51000

PE-1200

200*1500

1020

150-300

425-765

180

160

100900

PEX-150

150*750

120

18-48

8.5-28

8.5-28

15

3500

PEX-250

250*750

210

25-60

22-60

22-60

22

5500

PEX-250

250*1000

210

25-60

25-65

25-65

30

7000

PEX-250

250*1200

210

25-60

30-78

30-78

37

8200

PEX-300

300*1300

250

20-90

45-110

45-110

75

12000

Ball Mill serves for Extraction Of Tin From Its Ore /Tin Processing Plant


Model

Speed
(r/min)

Ball Load
(t)

Feeding Size
(mm)

Discharging Size
(mm)

Capacity
(t/h)

Power
(KW)

Weight
(T)

Φ 900×1800

38

1.5

≤ 20

0.075 -0.89

0.65-2

18.5

3.6

Φ 900×2100

38

1.3-1.4

≤ 15

0.075 -0.83

0.7-3.5

18.5

3.9

Φ 900×3000

38

2.7

≤ 20

0.075 -0.89

1.1-3.5

22

4.5

Φ 1200×2400

32

3.8

≤ 25

0.0745-0.6

1.5-4.8

30

11.5

Φ 1200×2800

32

3.3-3.5

≤ 25

0.0745-0.6

2-6

30

13

Φ 1200×4500

32

7

≤ 25

0.074 -0.4

1.6-5.8

45

13.8

Φ 1500×3000

27

8

≤ 25

0.074 -0.4

2-5

75

17

Φ 1500×3500

27

6.75

≤ 25

0.075 -0.4

3-7

75

17.5

Φ 1500×4500

27

14

≤ 25

0.074 -0.4

3.5-12

110

21

Φ 1500×5700

27

15

≤ 25

0.074 -0.4

3.5-8

115

24.7

Φ 1830×3000

24

18

≤ 25

0.074 -0.4

4-10

130

28

Φ 1800×3600

24

10.6-11.35

≤ 25

0.075 -0.4

5-22

130

33.5

Φ 1830×7000

24

25

≤ 25

0.074 -0.4

7.5-17

210

36

Φ 2100×3600

22

14-15.2

≤ 25

0.075 -0.4

15-36

370

46.8

Φ 2200×5500

21

30

≤ 25

0.074 -0.4

10-20

210

48.5

Φ 2200×6500

21

31

≤ 25

0.074 -0.4

14-26

380

52.8

Φ 2200×7500

21

33

≤ 25

0.074 -0.4

16-29

380

56

Φ 2400×3000

20.6

15.5

≤ 25

0.075 -0.4

22-24

245

59

Φ 2400×4500

21

30

≤ 25

0.074 -0.4

8.5-60

380

65

Φ 2700×3600

20.6

39

≤ 25

0.074 -0.4

12-70

400

91.3

Φ 2700×4000

20.7

40

≤ 25

0.074 -0.4

12-80

400

94

Φ 2700×4500

20.7

48

≤ 25

0.074 -0.4

12-90

430

102


Spiral Chute that serves for Extraction Of Tin From Its Ore /Tin Processing Plant


Spiral Diameter(mm) 2000 1500 1200 900 600 400
Spiral Pitch(mm) 1200 720/540 900/720 /540 675/540 /405 450/360 /270 240/180
Ratio of
Pitch To Diameter
0.6 0.48/0.36 0.75/0.6 /0.45 0.75/0.6 /0.45 0.75/0.6 /0.45 0.6/0.45
Lateral  Obliquity
Starts 3 4 4 4 2 2
Feeding Sizes(mm) 2.00-0.04 0.8-0.037 0.3-0.03 0.3-0.03 0.2-0.02 0.2-0.02
Feeding Density (%) 30-55 30-60 25-35 25-55 25-55 25-55
Capacity(t/h) 7-10 6-8 4-6 2-3 0.4-0.8 0.15-0.2
Dimension
(mm)
Length 2120 1600 1360 1060 700 460
Width 2120 1600 1360 1060 700 460
Height 5600 5300 5230 4000 2600 1500
Weight (kg ) 900 800 600 400 150 50

Shaking table that serves for Extraction Of Tin From Its Ore /Tin Processing Plant

Name
Unit
Grit concentrating table
Fine sand concentrating table
Sludge concentrating table
Dimensions
Length
MM
4450
4450
4450
Driving part width
MM
1855
1855
1855
Concentrate part width
MM
1546
1546
1546
Max. feeding size
MM
2
0.5
0.15
Feeding amount
T/d
30-60
10-20
15-25
Feeding thickness
%
25-30
20-25
15-25
Journey
Mm
16-22
11-16
8-16
Frequency
F
15-48
48-53
50-57
Water quantity
T/d
80-150
30-60
10-17
Horizontal obliquity
Degree
2.5-4.5
1.5-3.5
1-2
Portrait obliquity
%
1.4
0.92
-----
Table board corner
Degree
32-42
40
42
Concentrating square
----
7.6
7.6
7.6
Table board length ratio
----
2.6
2.6
2.6

Extraction Of Tin From Its Ore


What we can provide for the Extraction Of Tin From Its Ore /Tin Processing Plant


  1. Mineral tests for choosing the most effective solution
  2.  Equipment selection for each process
  3.   Equipment production and quality inspection
  4.  Foundation drawings for each equipment
  5. Timely deliery and installation guidance overseas.
  6.  Commissionng and trainning for the whole Tin Ore processing plant
  7. Long term spare parts supply.

Tin Processing Plant

Extraction Of Tin From Its Ore




Product Categories : Complete Beneficiation Plant > Gravity Processing Plant

Home > Products > Complete Beneficiation Plant > Gravity Processing Plant > Cassiterite Ore Mining Processing Plant For Tin Extraction
Email to this supplier
  • *Subject:
  • *To:
    Mr. Sam Zhang
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send