Home > Products > Complete Beneficiation Plant > Gravity Processing Plant > Placer Gold Mining Equipment For Gold Wash Plant

Placer Gold Mining Equipment For Gold Wash Plant

Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,FCA,CPT
Min. Order:
1
Transportation:
Ocean
Port:
Qingdao Port,Tianjin Port,Shanghai
Share:
  • Product Description
Overview
Product Attributes

Model No.MY-30

BrandMingyuan

CertificationOther

TypeGravity Separator

CustomizedCustomized

ColorMulti Color

Warranty1 Year

Energy SavingEnergy Saving

Material FeatureHeat Resistant

MaterialCarbon Steel

Weight<1T

Voltage380V

ConditionNew

Applicable MaterialChrome, Tin, Hematite, Placer Gold

Spiral Chute Model1200mm

Shaking Table Model6-S

Shaking Table Power1.1KW

Optional Capacity10-15, 35-40,80-120TPH

Gold Contrifugal Concentrator ModelMY-30

Gold Contrifugal Concentrator Power1.5KW

Slurry Pump15KW

Capacity2-3TPH

Supply Ability & Additional Information

PackagingContainer Loading

Productivity100-10000tpd

TransportationOcean

Place of OriginHenan, China

Supply Ability20 Sets per month

CertificateCE, ISO

HS Code8474100000

PortQingdao Port,Tianjin Port,Shanghai

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

Packaging & Delivery
Package Type:
Container Loading

There are many placer gold mining equipment for placer gold mining process, such as jig machine, gold concentrifugal concentrator, spiral chute, wet pan mill, shaking table, gold trommel and so on. as the gold mainly occures as gold beads in the placer gold, so the whole process is mainly a separation process. and there are a lot of clay mixed in the ore, so it's necessary to remove the clay first, both gold rotary trommel and rotary scrubber can be used for the clay removing purpose. 

placer gold mining equipment

After the placer gold goes through the rotary scrubber or rotary trommel, the big size stone is effectively removd from the ore, and and clay is dissolved in water and which go to the gold contrifugal concentrator for further separation, in the gold concentrifugal conentrator more tailing will be removed and in order to guarantee the recovery rate is as high as possible, it's necessary for the tailing to go to the gold chute, which is with carpet inside it. then the small gold particles can be concentrated. the medium gold particles will go to the shaking table for refining, then we can get the high content gold concentrate, and it will become gold ignot after the murcury mixing, distiller and gold furnace processes.

placer gold mining equipment

Spiral Chute that serves as placer gold mining equipment /Gold Mining Equipment

Spiral Diameter(mm) 2000 1500 1200 900 600 400
Spiral Pitch(mm) 1200 720/540 900/720 /540 675/540 /405 450/360 /270 240/180
Ratio of
Pitch To Diameter
0.6 0.48/0.36 0.75/0.6 /0.45 0.75/0.6 /0.45 0.75/0.6 /0.45 0.6/0.45
Lateral  Obliquity
Starts 3 4 4 4 2 2
Feeding Sizes(mm) 2.00-0.04 0.8-0.037 0.3-0.03 0.3-0.03 0.2-0.02 0.2-0.02
Feeding Density (%) 30-55 30-60 25-35 25-55 25-55 25-55
Capacity(t/h) 7-10 6-8 4-6 2-3 0.4-0.8 0.15-0.2
Dimension
(mm)
Length 2120 1600 1360 1060 700 460
Width 2120 1600 1360 1060 700 460
Height 5600 5300 5230 4000 2600 1500
Weight (kg ) 900 800 600 400 150 50

placer gold mining equipment

Shaking table that serves as the Gold Mining Equipment /Gold Mining Equipment

Name
Unit
Grit concentrating table
Fine sand concentrating table
Sludge concentrating table
Dimensions
Length
MM
4450
4450
4450
Driving part width
MM
1855
1855
1855
Concentrate part width
MM
1546
1546
1546
Max. feeding size
MM
2
0.5
0.15
Feeding amount
T/d
30-60
10-20
15-25
Feeding thickness
%
25-30
20-25
15-25
Journey
Mm
16-22
11-16
8-16
Frequency
F
15-48
48-53
50-57
Water quantity
T/d
80-150
30-60
10-17
Horizontal obliquity
Degree
2.5-4.5
1.5-3.5
1-2
Portrait obliquity
%
1.4
0.92
-----
Table board corner
Degree
32-42
40
42
Concentrating square
----
7.6
7.6
7.6
Table board length ratio
----
2.6
2.6
2.6

Gold Mining Equipment


What we can provide for the Gold Mining Equipment /Gold Mining Equipment


  1. Mineral tests for choosing the most effective solution
  2.  Equipment selection for each process
  3.   Equipment production and quality inspection
  4.  Foundation drawings for each equipment
  5. Timely deliery and installation guidance overseas.
  6.  Commissionng and trainning for the whole chrome processing plant
  7. Long term spare parts supply.

flowchart of gold washing plant

Chromite Ore Beneficiation Process



Product Categories : Complete Beneficiation Plant > Gravity Processing Plant

Download
Home > Products > Complete Beneficiation Plant > Gravity Processing Plant > Placer Gold Mining Equipment For Gold Wash Plant
Email to this supplier
  • *Subject:
  • *To:
    Mr. Sam Zhang
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send